How close can I build to a well or septic system?

A 5’ setback is required from any structure to the exterior surface of a holding or treatment tank. A 15’ setback is required from the drainfield of a septic system. Winnebago County does not regulate wells. Please contact the DNR or a licensed well driller for information regarding wells.